1.8 sec in total
566 ms
911 ms
303 ms
Visit gmsproject.org now to see the best up-to-date Gmsproject content for Senegal and also check out these interesting facts you probably never knew about gmsproject.org
Visit gmsproject.orgWe analyzed Gmsproject.org page load time and found that the first response time was 566 ms and then it took 1.2 sec to load all DOM resources and completely render a web page. This is quite a good result, as only 25% of websites can load faster. This domain responded with an error, which can significantly jeopardize Gmsproject.org rating and web reputation
gmsproject.org performance score
name
value
score
weighting
Value3.2 s
43/100
10%
Value3.6 s
61/100
25%
Value3.2 s
92/100
10%
Value60 ms
100/100
30%
Value0.032
100/100
15%
Value3.8 s
89/100
10%
566 ms
37 ms
53 ms
37 ms
38 ms
Our browser made a total of 49 requests to load all elements on the main page. We found that 96% of them (47 requests) were addressed to the original Gmsproject.org, 4% (2 requests) were made to Google-analytics.com. The less responsive or slowest element that took the longest time to load (566 ms) belongs to the original domain Gmsproject.org.
Page size can be reduced by 131.1 kB (67%)
194.2 kB
63.1 kB
In fact, the total size of Gmsproject.org main page is 194.2 kB. This result falls beyond the top 1M of websites and identifies a large and not optimized web page that may take ages to load. 30% of websites need less resources to load. HTML takes 174.9 kB which makes up the majority of the site volume.
Potential reduce by 129.4 kB
HTML content can be minified and compressed by a website’s server. The most efficient way is to compress content using GZIP which reduces data amount travelling through the network between server and browser. HTML code on this page is well minified. It is highly recommended that content of this web page should be compressed using GZIP, as it can save up to 129.4 kB or 74% of the original size.
Potential reduce by 34 B
It’s better to minify JavaScript in order to improve website performance. The diagram shows the current total size of all JavaScript files against the prospective JavaScript size after its minification and compression. This website has mostly compressed JavaScripts.
Potential reduce by 1.6 kB
CSS files minification is very important to reduce a web page rendering time. The faster CSS files can load, the earlier a page can be rendered. Gmsproject.org needs all CSS files to be minified and compressed as it can save up to 1.6 kB or 76% of the original size.
Number of requests can be reduced by 30 (64%)
47
17
The browser has sent 47 CSS, Javascripts, AJAX and image requests in order to completely render the main page of Gmsproject. We recommend that multiple CSS and JavaScript files should be merged into one by each type, as it can help reduce assets requests from 12 to 1 for JavaScripts and from 11 to 1 for CSS and as a result speed up the page load time.
gmsproject.org
566 ms
commonspot.css
37 ms
browser-all.js
53 ms
section_default.css
37 ms
screen.css
38 ms
commonspot.css
56 ms
always-include-common.js
40 ms
always-include-moz.js
55 ms
undohtml.css
29 ms
main.css
34 ms
ie6.css
36 ms
ga.js
8 ms
overlay_bg.png
50 ms
page_bg.png
50 ms
spacer_4.png
56 ms
pepfar_4.png
108 ms
usaid_1.jpg
53 ms
msh2_1.jpg
53 ms
abt_1.jpg
48 ms
futures2_3.jpg
49 ms
alliance_1.jpg
54 ms
pact_1.jpg
54 ms
RGH-HorizFull-1.jpg
59 ms
trg.jpg
58 ms
gmsleft_2.jpg
68 ms
util.js
39 ms
__utm.gif
14 ms
header_home_bg.png
41 ms
identity_home_bg.png
43 ms
logo_home.png
42 ms
title_home.png
64 ms
home_bg.png
53 ms
support.png
53 ms
bullet_brown.gif
56 ms
nav_bullet.png
56 ms
footer_bg.png
68 ms
footer_p_bg.png
70 ms
util.js
39 ms
buttons.css
40 ms
buttons.css
43 ms
lightbox.css
45 ms
lightbox.css
19 ms
lightbox.js
26 ms
lightbox.js
20 ms
overrides.js
22 ms
overrides.js
19 ms
window_ref.js
23 ms
window_ref.js
19 ms
print.css
20 ms
gmsproject.org accessibility score
Contrast
These are opportunities to improve the legibility of your content.
Impact
Issue
Background and foreground colors do not have a sufficient contrast ratio.
Names and labels
These are opportunities to improve the semantics of the controls in your application. This may enhance the experience for users of assistive technology, like a screen reader.
Impact
Issue
<frame> or <iframe> elements do not have a title
gmsproject.org best practices score
Trust and Safety
Impact
Issue
Does not use HTTPS
Ensure CSP is effective against XSS attacks
gmsproject.org SEO score
Crawling and Indexing
To appear in search results, crawlers need access to your app.
Impact
Issue
Page is blocked from indexing
Mobile Friendly
Make sure your pages are mobile friendly so users don’t have to pinch or zoom in order to read the content pages. [Learn more](https://developers.google.com/search/mobile-sites/).
Impact
Issue
Document uses legible font sizes
EN
EN
ISO-8859-1
Language claimed in HTML meta tag should match the language actually used on the web page. Otherwise Gmsproject.org can be misinterpreted by Google and other search engines. Our service has detected that English is used on the page, and it matches the claimed language. Our system also found out that Gmsproject.org main page’s claimed encoding is iso-8859-1. Changing it to UTF-8 can be a good choice, as this format is commonly used for encoding all over the web and thus their visitors won’t have any troubles with symbol transcription or reading.
gmsproject.org
Open Graph description is not detected on the main page of Gmsproject. Lack of Open Graph description can be counter-productive for their social media presence, as such a description allows converting a website homepage (or other pages) into good-looking, rich and well-structured posts, when it is being shared on Facebook and other social media. For example, adding the following code snippet into HTML <head> tag will help to represent this web page correctly in social networks: