Analyze

pajah.wbs.cz: Magie a výklad karet > O mně

Stránka o magii

Page load speed analysis

  • 82/100

    Good result
  • 6

    Successful tests
  • 2

    Failed tests
  • First response

    672 ms

  • Resources loaded

    798 ms

  • Page rendered

    0 ms

  • Total page load time

    1.5 sec

Visit pajah.wbs.cz now to see the best up-to-date Pajah Wbs content for Czech Republic and also check out these interesting facts you probably never knew about pajah.wbs.cz

We analyzed Pajah.wbs.cz page load time and found that the first response time was 672 ms and then it took 798 ms to load all DOM resources and completely render a web page. This is quite a good result, as only 10% of websites can load faster.

Page optimization

  • HTML 5.3 kB
    Images 0 B
    Javascripts 8.9 kB
    CSS 0 B

    In fact, the total size of Pajah.wbs.cz main page is 14.2 kB. This result falls within a vast category (top 1 000 000) of heavyweight, probably not optimized, and thus slow loading web pages. Only a small number of websites need less resources to load. Javascripts take 8.9 kB which makes up the majority of the site volume.

    • Original 5.3 kB
    • After minification 5.3 kB
    • After compression 1.7 kB

    HTML optimization

    HTML content can be minified and compressed by a website’s server. The most efficient way is to compress content using GZIP which reduces data amount travelling through the network between server and browser. HTML code on this page is well minified. It is highly recommended that content of this web page should be compressed using GZIP, as it can save up to 3.6 kB or 69% of the original size.

    • Original 8.9 kB
    • After minification 5.4 kB
    • After compression 1.8 kB

    JavaScript optimization

    It’s better to minify JavaScript in order to improve website performance. The diagram shows the current total size of all JavaScript files against the prospective JavaScript size after its minification and compression. It is highly recommended that all JavaScript files should be compressed and minified as it can save up to 7.1 kB or 80% of the original size.

Network requests diagram

  • pajah.wbs.cz
  • AC_OETags.js
  • testflash.js

Our browser made a total of 3 requests to load all elements on the main page. We found that 33% of them (1 request) were addressed to the original Pajah.wbs.cz, 67% (2 requests) were made to Wbs.cz. The less responsive or slowest element that took the longest time to load (672 ms) belongs to the original domain Pajah.wbs.cz.

Additional info on pajah.wbs.cz

Requests

The browser has sent 2 CSS, Javascripts, AJAX and image requests in order to completely render the main page of Pajah Wbs. According to our analytics all requests are already optimized.

2

Javascripts

2

All

Possible request optimization

2

Javascripts

0

Optimized

2

All

Good result

IP address

Pajah.wbs.cz uses IP address which is currently shared with 4 other domains. The more sites share the same IP address, the higher the host server’s workload is. It is strongly recommended that the host server should be changed or the hosting provider should be requested to give a different (separate) IP address for this domain.

Poor result

IP Trace

pajah.wbs.cz

wbs.cz

wbl.sk

snadno.eu

tratovestroje.wbs.cz

185.175.85.74

DNS records

Type Host Target/ip TTL Other
A

pajah.wbs.cz

185.175.85.74 60
MX

pajah.wbs.cz

wbsmail.fortion.net 60 Pri: 10

Language and encoding

Good result

Language

CS cs language flag

Detected

CS cs language flag

Claimed

Encoding

UTF-8

Claimed

Language claimed in HTML meta tag should match the language actually used on the web page. Otherwise Pajah.wbs.cz can be misinterpreted by Google and other search engines. Our service has detected that Czech is used on the page, and it matches the claimed language. Our system also found out that Pajah.wbs.cz main page’s claimed encoding is utf-8. Use of this encoding format is the best practice as the main page visitors from all over the world won’t have any issues with symbol transcription.

HTTPS certificate

SSL Certificate

Pajah.wbs.cz has no SSL certificate. Web browsing can be safer with HTTPS connection, so we suggest that it should be obtained for this site.

Normal result

Visitor World Map

Country of origin for 96.9% of all visits is Czech Republic. It’s good for Pajah.wbs.cz that their server is also located in Czech Republic, as that enables the majority of their visitors to benefit from a much faster page load time.

Good result

Poor result

Social Sharing Optimization

Open Graph description is not detected on the main page of Pajah Wbs. Lack of Open Graph description can be counter-productive for their social media presence, as such a description allows converting a website homepage (or other pages) into good-looking, rich and well-structured posts, when it is being shared on Facebook and other social media. For example, adding the following code snippet into HTML <head> tag will help to represent this web page correctly in social networks:

pajah.wbs.cz

Share this report in social media

Analyze another website

Analyze