Analyze

wbs123.ws: WEBSITE.WS - Your Internet Address For Life™

Page load speed analysis

  • 49/100

    Normal result
  • 4

    Successful tests
  • 4

    Failed tests
  • First response

    169 ms

  • Resources loaded

    1.2 sec

  • Page rendered

    609 ms

  • Total page load time

    1.9 sec

Visit wbs123.ws now to see the best up-to-date Wbs 123 content and also check out these interesting facts you probably never knew about wbs123.ws

We analyzed Wbs123.ws page load time and found that the first response time was 169 ms and then it took 1.8 sec to load all DOM resources and completely render a web page. This is quite a good result, as only 30% of websites can load faster.

Page optimization

  • HTML 629 B
    Images 472.9 kB
    Javascripts 226.3 kB
    CSS 32.1 kB

    In fact, the total size of Wbs123.ws main page is 732.0 kB. This result falls beyond the top 1M of websites and identifies a large and not optimized web page that may take ages to load. 40% of websites need less resources to load. Images take 472.9 kB which makes up the majority of the site volume.

    • Original 629 B
    • After minification 623 B
    • After compression 296 B

    HTML optimization

    HTML content can be minified and compressed by a website’s server. The most efficient way is to compress content using GZIP which reduces data amount travelling through the network between server and browser. HTML code on this page is well minified. It is highly recommended that content of this web page should be compressed using GZIP, as it can save up to 333 B or 53% of the original size.

    • Original 472.9 kB
    • After optimization 428.7 kB

    Image optimization

    Image size optimization can help to speed up a website loading time. The chart above shows the difference between the size before and after optimization. Wbs 123 images are well optimized though.

    • Original 226.3 kB
    • After minification 226.3 kB
    • After compression 80.8 kB

    JavaScript optimization

    It’s better to minify JavaScript in order to improve website performance. The diagram shows the current total size of all JavaScript files against the prospective JavaScript size after its minification and compression. It is highly recommended that all JavaScript files should be compressed and minified as it can save up to 145.5 kB or 64% of the original size.

    • Original 32.1 kB
    • After minification 28.7 kB
    • After compression 6.3 kB

    CSS optimization

    CSS files minification is very important to reduce a web page rendering time. The faster CSS files can load, the earlier a page can be rendered. Wbs123.ws needs all CSS files to be minified and compressed as it can save up to 25.8 kB or 80% of the original size.

Network requests diagram

  • wbs123.ws
  • index.dhtml
  • layout13.css
  • element.js
  • head.png
  • translateelement.css
  • main.js
  • logo.png
  • trans1.png
  • 100.png
  • st_pic.png
  • v.png
  • wp_pic.png
  • sb_pic.png
  • email_pic.png
  • arrow1.png
  • arrow2.png
  • mlm-structure.gif
  • 100d.png
  • get.png
  • mike_alan.png
  • test1.jpg
  • test2.jpg
  • test3.jpg
  • bg100.jpg
  • bg_1top.png
  • bg_1.png
  • bg_1bot.png
  • freet_btn.png
  • sign2.png
  • make.png
  • line_make.png
  • sign.png
  • line_punk.png
  • ferr.png
  • yelow.png
  • simbols.png
  • ten_read.png
  • more.png
  • foot.png
  • footer-link-inc500.png
  • footer-link-dsa.png
  • element_main.js
  • translate_24dp.png
  • l
  • cleardot.gif
  • te_ctrl3.gif

Our browser made a total of 47 requests to load all elements on the main page. We found that 2% of them (1 request) were addressed to the original Wbs123.ws, 77% (36 requests) were made to Images2.website.ws and 11% (5 requests) were made to Translate.googleapis.com. The less responsive or slowest element that took the longest time to load (512 ms) relates to the external source Images2.website.ws.

Additional info on wbs123.ws

Requests

The browser has sent 46 CSS, Javascripts, AJAX and image requests in order to completely render the main page of Wbs 123. We recommend that multiple CSS and JavaScript files should be merged into one by each type, as it can help reduce assets requests from 4 to 1 for JavaScripts and as a result speed up the page load time.

4

Javascripts

39

Images

2

CSS

1

AJAX

46

All

Possible request optimization

1

Javascripts

29

Images

2

CSS

1

AJAX

13

Optimized

33

All

Normal result

IP address

Wbs123.ws uses IP address which is currently shared with 4 other domains. The more sites share the same IP address, the higher the host server’s workload is. It is strongly recommended that the host server should be changed or the hosting provider should be requested to give a different (separate) IP address for this domain.

Poor result

IP Trace

wbs123.ws

pixhost.ws

esoft.ws

gigle.ws

new-style.ws

64.70.19.203

DNS records

Type Host Target/ip TTL Other
A

wbs123.ws

64.70.19.203 299
MX

wbs123.ws

mail.hope-mail.com 3600 Pri: 1
TXT

wbs123.ws

300 Txt: v=spf1 ip6:fdd0:951e:ede7::/48 -all

Language and encoding

Poor result

Language

EN en language flag

Detected

N/A  language flag

Claimed

Encoding

ISO-8859-1

Claimed

Language claimed in HTML meta tag should match the language actually used on the web page. Otherwise Wbs123.ws can be misinterpreted by Google and other search engines. Our service has detected that English is used on the page, and neither this language nor any other was claimed in <html> or <meta> tags. Our system also found out that Wbs123.ws main page’s claimed encoding is iso-8859-1. Changing it to UTF-8 can be a good choice, as this format is commonly used for encoding all over the web and thus their visitors won’t have any troubles with symbol transcription or reading.

HTTPS certificate

SSL Certificate

Wbs123.ws has no SSL certificate. Web browsing can be safer with HTTPS connection, so we suggest that it should be obtained for this site.

Normal result

Visitor World Map

The server of Wbs123.ws is located in United States, but, unfortunately, we cannot identify the countries where the visitors come from and thus it’s impossible to define if the distance can potentially affect the page load time.

Good result

Poor result

Social Sharing Optimization

Open Graph description is not detected on the main page of Wbs 123. Lack of Open Graph description can be counter-productive for their social media presence, as such a description allows converting a website homepage (or other pages) into good-looking, rich and well-structured posts, when it is being shared on Facebook and other social media. For example, adding the following code snippet into HTML <head> tag will help to represent this web page correctly in social networks:

wbs123.ws

Share this report in social media

Analyze another website

Analyze